Main stages of repair in the apartment.
How to begin repair works of the apartment?
The very first phase of the repair of old houses is the destruction and taking apart to start with of the shabby walls and partition walls, eliminating the wall and ceiling finishing. This stage is among the most "unclean" stages of the repair.

The following stage is electrical wiring. Wiring can be installed in walls or along the flooring. Circuitry is made inside the pipelines to ensure electrical security and increase dependability. The pipeline protects circuitry from external damages and permits to replace the wire completely without breaking walls and flooring simply by placing the brand-new wire rather of the old one.
House Painting follows the wiring. The frequent error during the synchronised conducting of such works takes place when employees forget to lay out among the cable televisions and home painters have already plastered and ravelled the wall. As a result, extra works are essential to seal goes after on the completed wall. The locations of the feed switch and wall outlet place and their number must be thought-out beforehand. The plan of power circuitry is usually consisted of into the style project.
Later on the system need to be prepared to service in case of failures. urgent home repair tips In addition to the circuitries, the telephone cable television and the TV cable are laid out. The power cable television should not be set out near the telephone and antenna cable televisions to prevent noise pickup and disturbance. The most strange minute is setting out the TV cable. In order to make 2 (or 3) TV sets in the apartment the second cable television is frequently just "firmly soldered" in parallel, so the cable television resistance is reduced. As a result, the display quality is deteriorated, many programs can't be received and etc. In order to avoid such circumstance it is essential to invite a specialist with unique equipment. He will measure the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.
Painting is the most long-term process, that is why it is performed simultaneously in all facilities, if it is possible. Delays are related to the technology. Each used layer of the plaster (or filling in ending up) should dry entirely before the work will continue.
Works in sanitary arrangements and the kitchen begin at the same time with house painting. It is better to satisfy so-called "unclean" operate in the top place and at the same time. In accordance with the plan of the sanitary professional area welding, wall chasing and pipe run are performed. Steam radiator admissions are prepared, taps and brackets are mounted, however radiators are not installed.
Then operates in sanitary arrangements are performed according to the strategy. The bath is installed, then walls are smoothed out and the tile is laid on walls. The following phase is putting together ceiling and laying tiles on the floor. And at last other hygienic devices, mixers and devices are mounted.
After electrical wiring, installation of rosette plates and terminal boxes the voltage is signed in all point. Ends of circuitry are insulated and laid out into rosette plates. Sockets and breakers are not installed during this phase in order to save their surface look. The surface puttying of walls is carried out all at once. The technologically precise control of drying of the layer of the plaster (filling) is carried out by drymeter. It is an unique instrument that measures moisture of the material.
The following phase is the procedure of fill. Fill can be made with various products-- from normal masonry cement-sand mixture to self-aligning floors. The benefit of the easy mix is its cheapness, the downside is that such mixture is much harder aligned at the level and the last dry time of such fill is 40 days, only then the next phase of the deal with flooring can be conducted, i.e. the period is too long. Self-leveling self-aligning floors are much more pricey, however more technological. Lining up occurs nearly "instantly" i.e. fluid option of mix is poured out, then it runs and you receive the horizontal surface. The final dry time is 15 days i.e. you have significant time economy. The system "warm floor" is installed into the fill. If the so-called "wet procedures" are inapplicable the innovation of the dry lining up (the fill innovation) is used bases for floorings with adjustable floor battens are mounted.
After fill door boxes and door are set up. Setup of doors should take into the account thickness of future floor covering. After installation the door can be taken off its hinges and got rid of till the end of repair or loaded into polyethylene film to protect from damages. At the same time ceiling can be painted and the tile can be laid in that premises where it was prepared. The tile needs to be laid on the absolutely dry overlay.
Finishing of the floor installing depends upon the prepared covering. Most of the times (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are repaired to the floor by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to supply the close fixing of plywood and long-lasting service of the floor without squeak and bulging. The plywood offers the additional heat- and acoustic insulation. After installing of the plywood is finished, wallpaper for painting can be pasted on walls.
In premises where finish covering of the flooring is laminated flooring or parquet hoard, the regular wallpapers are pasted (not for painting) in the first location. Then the flooring covering is mounted.
If surface covering of the flooring is the block parquet, the parquet is laid in the first place, then it is scraped and covered by one layer of lacquer. After this the common wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The discussed consequence is connected only with such scrambling procedure when the terrific quantity of dust is produced. In spite of the truth that great flooring mills are geared up with the vacuum, the sufficient amount of dust is sped up on surrounding subjects consisting of walls. Dust is very acerbic and is severely washed off. That is why in order not to damage wallpapers, they are pasted after scrambling and in order the parquet do not absorb the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.
After this the main works can be considered to be ended up. It is left just to install the plinths, decorative elements, breakers and sockets, drape holders, to hang doors, plant-bands and others.
In conclusion it is required to note that the series of works was listed in basic and can alter depending upon the guaranteed circumstance-- the number of spaces in premise, your resources, peculiarities of the building and construction of the multilevel facilities. It is based upon good sense and everyone efficient in analysis can individually develop such a series.